VeilNet
VeilNet consultancy

Our engineers, alongside your team.

VeilNet engineers support your post-quantum transition from the first inventory to production: assessing your cryptographic architecture, designing the transition and validating it in a representative environment, including air-gapped ones.

What we help with

Support at every stage of your migration.

  • AssessPQC readiness assessmentMap your cryptographic dependencies with the observer, and rank what to protect first by business risk.A CBOM and a ranked list of risks
  • DesignTransition roadmapChoose proxy or TUN for each system, plan the realm tree and its compartments, and set the order of rollout.A roadmap, system by system
  • ValidateProof in your environmentProve the architecture, its security controls and its performance in a representative environment, air-gapped if needed.A validated architecture and its results
What we deliver

Deliverables at every stage.

Each stage of an engagement ends with something your team keeps and can act on.

Stage 01 · DiscoverA clear view of your cryptographic exposure
  • An inventory of the cryptography used by the systems in scope
  • A CycloneDX 1.6 CBOM, ready for audit
  • A quantum-risk assessment, ranked by business risk
  • For each risk, the side that must change: server or client
About Discover
Stage 02 · ProtectA validated transition architecture
  • Proxy or TUN mode chosen for each system, with subnet routers for the rest
  • The realm and compartment design for your network
  • A rollout plan, system by system
  • A pilot in a representative environment, air-gapped if needed, with its results
About Protect
Stage 03 · ManageOperations your team runs
  • The guardian suite deployed on your infrastructure, with sign-in through your identity provider
  • Node telemetry and flow records sent to your SIEM or collector
  • A post-quantum PKI with an ML-DSA certificate authority
  • Runbooks and a handover to your team
About Manage
How an engagement works

A structured path, from assessment to production.

  1. 01ScopeAgree the systems, the compliance frameworks and what success looks like, before any work begins.
  2. 02AssessObserve the network and build the inventory and CBOM, then rank the risk.
  3. 03DesignTurn the inventory into a roadmap: which mode for each system, and in what order.
  4. 04ValidateProve it in a representative environment with your team, ready to roll out.
Talk to us

Ready to plan your migration?

Tell us about your systems, your compliance requirements and your timelines, and we will propose an engagement that fits.